SF31 at the Museum |
|||||||||
After SF31's paintwork was tidied up for the 2000 Open Weekend, I decided that a complete repaint for the 2001 season was required. This would simply be a 'holding position' which would see the purple/blue and yellow repainted. The target was to repaint the lower panels for the STES weekend in May and to complete the job for the Museum Open Weekend in August. |
|||||||||
![]() |
|||||||||
Left : Stage 1 |
|||||||||
![]() |
|||||||||
Right : Stage 2 |
|||||||||